Safety and quality control on site

What we apply on site, with a photo for each practice.

Site safety

Trench shoring

Trench shoring

Shoring panels go in as we dig deep trenches, so nobody works in an unprotected trench.

Traffic management & barriers

Traffic management & barriers

Concrete and plastic barriers and "Safety First" signage separate the work zone from the road.

Safe night work

Safe night work

Cones, lighting and reflective tape mark the traffic path during night works.

Site board & fire extinguishers

Site board & fire extinguishers

Site information and permit board, with fire extinguishers at the work area.

Quality control

  1. 01

    Layered backfill

    Each layer is watered and compacted before the next goes in.

  2. 02

    Lab testing

    We coordinate field density and material tests with an accredited lab where the specification requires.

  3. 03

    Daily records

    Daily photos with date, time and coordinates for every stage, shared with the main contractor or consultant.

  4. 04

    Section handover

    Each section is handed over complete (backfill and surface) before the next is opened.